CEMENT FLAT FILLING THE CAPE BETWEEN PERIMETER SCHOOL BUILDING -REGARDINGCEMENT FLAT FILLING THE CAPE BETWEEN PERIMETER SCHOOL BUILDING -REGARDING
Dear Sir/Madam, A cement flat was constructed in the area between the perimeter wall and the school building, which was previously covered with stones and sail. This improvement was made